On-Going Maintenance Projects:

  • Landscape Maintenance Services
    • Contractor is RDS Lawncare.
    • Services include:
      • Mowing
      • Edging
      • Fertilizing
      • Pruning
      • Weeding
  • Semi-annual Application of Pine Straw
    • Contractor is RDS Lawncare
  • Maintenance of the Community’s Gardens
    • Work performed by the Community Garden Club

Previous LANDSCAPE Projects:

  • Flagpole Gardens Landscaping #1
    • Redesign of the gardens at the intersection of Chartwell and Beach Club Lane
    • Performed Fall, 2014
    • Contractor was a master gardener with work performed by the Community Garden Club
  • Wildflower Garden Landscaping #1
    • Redesign of the Wildflower Garden
    • Work performed by members of the Community Garden Club
  • Berm Landscaping #1
    • Original Landscaping of the Community berms in 2008-2009
  • Berm Landscaping #2
    • Landscaping of the Wave Crest/Sailview and Sunfish berms after completion of the Ryan Homes
      • Contractor was RDS Lawncare
      • Contractor Selection involved RFP Process
  • Berm Landscaping #3
    • Adding Holly Shrubs in numerous locations
  • Tree Replacement (along Beach Club Lane)
    • The Community replaces a number of dead trees in the community every year.
    • The largest number of trees replaced is along Beach Club Lane.
      • NOTE: The City of Tega Cay owns the street; but, the HOA owns the trees along the street
  • Ryan Homes Landscape Improvement Project
    • Adding Crepe Myrtles in front and side lawns of Ryan Homes
    • Performed Fall, 2014
    • Contractor was RDS Lawncare
  • Hillside Bush Hog Project
    • Performed November 17, 2015
    • Contractor was Earth & Woods

Previous HOME MAINTENANCE Projects:

  • Horton-built Home Painting Project
    • Scheduled to be performed in the Spring of 2016
      • CertaPro is the contractor
  • Wooden Deck Repair Project
    • Scheduled to be performed in conjunction with the Painting Project in the Spring of 2016
      • CertaPro is expected to be the contractor
  • Ryan-built Home Power Washing Project
    • Scheduled to be performed at roughly the same time as the Horton Home Painting Project in the Spring of 2016
      • CertaPro is expected to be the contractor
  • Four Story Horton-built Home Caulking Project
    • Currently working to arrange a contractor for the project
      • ServPro is the potential contractor
  • Roof Repair Project
    • This project started in mid-2015 and most of the work was completed at that time.  However, there is on-going work associated with the roof repairs.
      • AllPhase Exteriors is our Roofing Maintenance Contractor for this project.
  • Horton Home Power Washing
    • Performed in 2012
  • Horton Home Wooden Deck Repairs
    • Performed in 2012
  • Horton Home Caulking
    • Performed in 2012

Previous INFRASTRUCTURE Projects:

  • Street Repairs
    • Repairs due to street deterioration due to weather.  Streets included:
      • Chartwell
      • Halyard
      • Inlet Point
      • Sailview
      • Sunfish
      • Wave Crest
    • Performed by RAM in 2014
  • Driveway and Concrete Repairs #1
    • Performed by C&J Contractors in 2014
  • Driveway and Concrete Repairs #2
    • Performed by RAM in 2015
  • Sunfish South Paver Repairs #1
    • Behind 607 Sunfish
  • Sunfish South Paver Repairs #2
    • Behind 607, 627 and 629 Sunfish

 